Executive Summary
ThirdEye Data AI proposes to make Gujarat Met Coke & Energies (GMCE) an AI-run plant from the first day of operation. Cameras with AI, sensors on the machines and one plant system will follow every order, every truck, every tonne of coal and every oven, from the moment an order arrives to the moment the coke truck leaves the gate.
1.1 What we are proposing
- A plant run by its orders. Every order sets the coal blend, the coal to buy, and the oven plan, so the plant makes what its buyers ordered.
- AI that sees. Cameras read number plates, count trucks and charges, confirm the right coal goes into the right hopper, record every oven push, check loading, and guard the plant at night with video evidence.
- AI that keeps machines running. Sensors on crushers, conveyors, stampers, and finishing machines feed AI that warns days before a breakdown, alongside a planned maintenance schedule.
- One system, one screen. One plant ERP records every order, weight, test and dispatch. One simple screen shows the plant head everything, live, with forecasts.
- One partner. ThirdEye Data supplies, installs, and supports all hardware and software, with one point of contact.
1.2 One partner for everything
This is the heart of what ThirdEye Data offers GMCE. A digital plant usually needs a camera vendor, a sensor supplier, a network contractor, an ERP company, an AI team and a support agency, and the plant head ends up managing all of them. With ThirdEye Data, GMCE deals with one partner for everything.
- One contract, one contact. One contract and one ThirdEye Data program manager for cameras, sensors, network, AI, ERP and dashboards.
- One team accountable. If something does not work, there is no argument between a camera vendor, a network contractor and a software company. ThirdEye Data owns the fix.
- Built to work together. Every device and system is chosen and designed to work together from day one: one data hub, one login, one screen.
- Faster to start. One team plans, supplies and installs everything, so Phase 1 can be ready in about 12 to 15 days from the order.
- One number to call. Warranties are held by ThirdEye Data, with one helpdesk for every issue and a resident engineer for the first 3 months.
- Grows with you. New cameras, sensors and use cases plug into the same platform as the plant grows.
1.3 How to read this proposal
Section 2 shows how your plant works today. Section 3 explains how met coke is made to order. Section 4 shows where AI fits. Section 5 tells the story of one order, chapter by chapter, and what the AI and software do at each step. Sections 6 and 7 list every use case and the exact solution against each. The rest covers the future process, the plant command centre, hardware, phases and support.
ThirdEye Data’s Understanding of Your Plant
GMCE is restarting a two-line, 328 (approx) oven, stamp-charged met coke plant that has been idle for about 7 years. The machines are in place and being repaired. Start-up is expected in 15 to 30 days, and today there is no CCTV, network or computer system.
2.1 What GMCE asked us for
- Consultant. Walk the plant, understand the process and recommend the full set of use cases.
- Hardware and software partner. Supply, install and run cameras, sensors, network, AI, ERP and dashboards.
- Single point of contact. One accountable team for every device, system and support call.
2.2 Your plant at a glance
| Section | Equipment | Count | What it does |
|---|---|---|---|
| Gate | Weighbridges (existing) | 2 | Weigh coal trucks in and coke trucks out |
| Shed and hoppers | Storage hoppers, conveyor with belt weigher | To confirm | Store coal by grade and release it by weight |
| Crusher zone | Crushers | 3 (approx) | Grind the blend fine for both lines |
| Bharat line | Hoppers / stampers / ovens | 4 / 4 / 164 (approx) | Stamp the blend into cakes and cook them about 24 hours |
| Gujarat line | Hoppers / stampers / ovens | 4 / 3 / 164 (approx) | Same as the Bharat line |
| Oven area | Finishing machines | 3 (approx) | Push the cooked coke out of the ovens |
| Cooling house | Water spray system | 1 (approx) | Cools the hot block |
| Screening | Quality check station | 1 | Checks the coke against specification |
| Final crusher | Crusher and product hoppers | 1 (approx) | Breaks blocks into 20, 40 and 60 mm and stores them |
Table 1. Plant equipment as observed on our visit. Each line has 4 (approx) units of 41 (approx) ovens.
2.3 How your plant works today
This is the process as we saw it on our visit: coal comes in by truck, is blended, stamped, cooked, cooled, checked, sized and sent out by truck.
| Step | What happens | What is missing today |
|---|---|---|
| 1 · Gate and weighbridges | Coal truck is weighed on one of the 2 weighbridges and parks in the shed | Truck numbers and weights written by hand |
| 2 · Shed and hoppers | Coal unloaded into hoppers by grade and released by belt weight | No live stock by grade; wrong-hopper tipping unseen |
| 3 · Blending and crushing | Grades mixed and crushed fine by 3 (approx) crushers | Mix decided by experience; no warning before a crusher fails |
| 4 · Stamping and charging | Stamper presses a cake and charges an empty oven | Charges logged on paper; people close to moving machines |
| 5 · Coking and pushing | Cake cooks about 24 hours; finishing machine pushes it out | Cooking time not tracked oven by oven |
| 6 · Cooling house | Water sprayed from above cools the block | Hot spots and water use unknown |
| 7 · Screening and quality | Coke checked against the buyer's specification | Results on paper, not traced to the blend |
| 8 · Final crusher | Blocks broken to 20, 40 and 60 mm and stored | Stock by size unknown |
| 9 · Loading and dispatch | Truck loaded, weighed out and sent to the buyer | Invoices by hand; no check of grade loaded |
Table 2. The 9 steps and what is missing without digital systems.
2.4 The heart of the plant: 328 (approx) ovens
Every oven moves through five states about once a day. 7 (approx) stampers and 3 (approx) finishing machines serve all 328 (approx) ovens, so the schedule is tight. Knowing the state and cooking time of every oven, live, is the most valuable view the plant head can have.
How Met Coke Is Made to Order
A met coke plant makes to order. The buyer's specification decides the coal blend, the blend decides the coke, and the plant proves the result before it dispatches. Demand drives supply.
3.1 Coal grades and blending
Coking coal is bought in grades. Indian coking coal is graded by ash content, and every lot is also tested on arrival for moisture, ash, volatile matter and sulphur.
| Indian coking coal grade | Ash content |
|---|---|
| Steel Grade I | Up to 15% |
| Steel Grade II | 15 to 18% |
| Washery Grade I | 18 to 21% |
| Washery Grade II | 21 to 24% |
| Washery Grade III | 24 to 28% |
| Washery Grade IV | 28 to 35% |
Table 3. Indian coking coal grades by ash content (Annex B, 1).
No single coal usually matches an order, so plants blend. The mix is worked out so that ash, volatile matter and sulphur land within the target; a volatile matter of about 26 to 29% in the blend is generally considered good for coking (Annex B, 1). Stamp charging, which GMCE uses, presses the blend into a dense cake, which lets plants use lower-cost coking coals and still make strong coke (Annex B, 2).
3.2 What buyers ask for
| Parameter | What it measures | Typical limit |
|---|---|---|
| Moisture | Water in the coke | 5% max |
| Sulphur | Harmful to steel quality | 0.60% max |
| Phosphorus | Harmful to steel quality | 0.03% max |
| CSR | Strength after reaction in the furnace | 65% min |
| CRI | Reactivity | 23% max |
| M40 | Cold strength | 85% min |
| M10 | Abrasion (fines produced) | 7% max |
| Size | Share within the size band | 30 to 80 mm, 90% min |
Table 4. Example low-ash met coke specification from an Indian supplier (Annex B, 3). GMCE's own grade definitions are to be confirmed.
Where AI Fits in Your Plant
ThirdEye Data is an AI company, and AI is at the centre of this proposal. It works alongside sensors and software, and each does a different job. Here is what each one does, in plain words, and where it sits in your plant.
4.1 Four kinds of help
- AI that sees (computer vision). Cameras connected to AI do the watching, reading and counting that people cannot do round the clock.
- AI that predicts. Models that learn from your plant's own data warn of breakdowns, forecast output and check the coal blend before ovens are charged.
- Sensors that measure (IoT). Small devices on machines, hoppers and pipes send readings every few seconds. They are the eyes and ears for the predicting AI.
- Software that remembers (ERP and dashboards). The plant ERP keeps every record in one place, and the command centre shows it simply.
4.2 Where the AI works
The numbers on the picture show where AI works in your plant. In a line or two each:
- 1 · Gate. Cameras read every number plate, count trucks in and out, and match each truck to its order and coal grade.
- 2 · Two weighbridges. Weight goes straight into the system with photos of the truck and plate; AI flags anyone standing on the platform or a truck weighed twice.
- 3 · Coal shed. AI checks that each truck tips into the right hopper for its grade, and heat cameras watch the coal heaps for fires.
- 4 · Crushers and belts. Cameras spot stones, metal and belt damage, and AI warns days before a crusher fails.
- 5 · Stampers. Cameras read the oven number at every charge, count charges, and sound a siren when a person is near a moving stamper.
- 6 · Oven batteries. AI records every push, spots door smoke, under-cooked coke and hot spots on the oven walls.
- 7 · Cooling house. Heat cameras check that no hot spot is left before coke is loaded.
- 8 · Screening and sizing. AI measures coke size by camera on the belt, and the digital lab issues the test certificate.
- 9 · Loading and exit. AI checks the right grade is loaded and the truck is covered, reads the plate, and sends the exit weight to the invoice.
- 10 · Whole plant, 24 × 7. AI raises intrusion and theft alerts with video evidence, checks safety gear, watches for fire and marks attendance by face.
The Story of One Order
The best way to see what the AI does is to follow one order through the plant. A foundry buyer orders 500 tonnes of Grade 2 met coke, 40 mm, for delivery in 10 days. Here is what happens next, chapter by chapter.
5.1 Chapter 1: The order arrives
A foundry buyer orders 500 tonnes of Grade 2 met coke, 40 mm size, for delivery in 10 days. The sales team enters it once in the order book. Within seconds the plant knows what is needed: how many ovens to charge each day and how much coal of each grade.
UC03 On-time delivery forecast. AI checks ovens, coal stock and machine health every day and warns if an order is at risk of being late.
UC01 Order book. Every buyer's order is entered once: coke grade, size, quantity and delivery date. Everyone in the plant sees the same order.
UC02 Production planning. The system works out how many ovens to charge each day and how much coal of each grade the orders need.
5.2 Chapter 2: Planning the blend
The blend planner looks at the order's limits for ash, sulphur and strength, and at the lab results of the coal lots in stock. It recommends 25% Coal B and 75% Coal C. Before a single oven is charged, AI forecasts the coke this mix will give and confirms it should meet Grade 2. The lab still tests the coke after it is made; the forecast simply warns early, while the mix can still be changed.
UC05 Coke quality forecast before charging. The lab still tests every batch. Before ovens are charged, AI uses the lab results of the coal lots in the blend, and how past blends turned out, to forecast the ash, sulphur and strength the coke will have, so a risky mix is changed before coal is wasted.
UC04 Blend recipe planner. Recommends the coal mix for each order, for example 25% Coal B and 75% Coal C, from the order's limits and each coal lot's test results.
5.3 Chapter 3: Buying the right coal
The plan needs more Coal C than the shed now holds. AI raises a reorder alert days in advance, and purchase books coal from the supplier with the best quality record for that grade. Looking further ahead, AI also forecasts which grades buyers are likely to order in the coming weeks, so the right coal is in stock before the orders arrive.
UC07 Coal reorder alert. AI forecasts how many days each coal grade will last against the orders in hand and alerts purchase before it runs out.
UC08 Demand forecast and coal stocking plan. AI learns from past orders, buyers and seasons to forecast which coke grades are likely to be ordered in the coming weeks, and recommends how much of each coal grade to stock, so coal is bought before the orders arrive.
UC06 Coal stock by grade. Live stock of every coal grade in the shed and hoppers, so purchase knows exactly what is there.
UC09 Supplier quality record. Each supplier's coal quality, truck by truck, to guide buying and support quality claims.
5.4 Chapter 4: The coal truck reaches the gate
The truck arrives at 7:42 in the morning. The gate camera reads its number plate, AI counts it as coal truck 14 of the day, and the system matches it to the purchase order for Coal C. The barrier opens and the truck's journey through the plant is now being timed.
UC10 Number plate reading. A camera reads every truck's number plate at entry and exit, day and night, without anyone writing it down.
UC11 Truck counting. AI counts every coal truck coming in and every coke truck going out, by hour, shift and day.
UC13 Truck waiting time. Time from gate-in to gate-out for every truck, with delays shown stage by stage.
UC12 Truck matched to order and coal grade. The truck number is matched to the expected supplier, purchase order and coal grade. Unknown trucks are flagged at the gate.
5.5 Chapter 5: On the weighbridge
On one of the plant's two weighbridges, the weight flows straight into the system with photos of the truck and its number plate. AI checks that nobody is standing on the platform and that the truck is fully on it. The weigh slip prints by itself.
UC15 Weighment photo evidence. Every weighment stores photos of the truck on the platform and of its number plate.
UC16 Weighbridge cheating alerts. AI flags a person or object on the platform, a truck not fully on it, or the same truck weighed twice.
UC14 Automatic weight capture. Weight goes straight from both existing weighbridges into the system. Nobody types or writes it.
UC17 Net weight and weigh slip. Gross, tare and net weight worked out and the weigh slip printed automatically.
5.6 Chapter 6: Unloading in the shed
A sample goes to the lab and the result is stored against this truck. As the truck tips its load, AI confirms it went into the Coal C hopper. The coal lot is now tracked by grade: from here it can be followed all the way to the buyer's truck. Heat cameras keep watch over the heaps for self-heating.
UC19 Right coal, right hopper. AI watches unloading and confirms which hopper each truck tipped into. If the grade is wrong, it raises an alert at once.
UC22 Coal fire watch. Heat cameras spot coal heating up in the shed before it catches fire.
UC18 Coal test result per truck. The lab result of each truck's sample is stored against that truck and coal lot.
UC20 Coal grade tracking, coal to coke. Follows each coal lot from truck to hopper, blend, oven and coke batch, and on to the buyer's truck.
UC21 Hopper levels. Sensors show how full each hopper is, all the time.
UC23 Coal reconciliation. Coal received minus coal used is checked against coal in stock every day. Gaps are flagged.
5.7 Chapter 7: Blending and crushing
The hoppers release coal by weight, and the belt weigher confirms the mix really is 25 : 75. Cameras over the belt spot a piece of metal and stop it before it reaches the crusher. Sensors on the crushers report their vibration and temperature every few seconds.
UC25 Stones and metal on the belt. AI spots stones, metal, wood or oversize lumps on the belt before they reach the crushers.
UC26 Belt health. AI spots belt tears, a belt running off-centre, spillage, or a belt running empty.
UC24 Blend check, actual vs recipe. Belt weigher readings confirm that the actual mix matches the recipe for the order.
UC27 Crusher output and stoppages. Tonnes crushed per hour, running hours and every stoppage with its reason.
5.8 Chapter 8: Stamping and charging the ovens
The stamper presses the blend into a cake and charges oven B-117. Its camera reads the oven number, so the oven tracker updates itself and the charge is counted for the shift. When a worker steps onto the track, a siren sounds before the machine moves.
UC28 Oven tracker, all 328 (approx) ovens. Shows every oven's state and cooking time on one screen. Shift teams update it on tablets from day one; cameras then update it automatically.
UC29 Oven number recognition. Cameras on the stamper read which oven it is charging, so every charge is logged against the right oven.
UC30 Charge counting. AI counts every charge by stamper, line and shift. Production is counted, not estimated.
UC31 Danger zone on the rail tracks. If a person is near a moving stamper or finishing machine, a siren sounds and the operator is warned.
—
5.9 Chapter 9: Cooking and pushing
Oven B-117 cooks for about 24 hours while the tracker counts down. When it is ready, the finishing machine pushes the coke out and the push is recorded against the oven. AI watches for heavy smoke at push, a sign of under-cooking, and for smoke leaking from doors.
UC33 Push detection. Cameras on the finishing machines record every push against its oven, and compare it with the plan.
UC34 Under-cooked coke warning. Heavy smoke when an oven is pushed is a sign of under-cooking. AI spots it and alerts the shift in-charge.
UC35 Oven door leaks. AI spots smoke leaking from oven doors so seals are fixed early.
UC36 Oven wall hot spots. Heat cameras map hot spots on oven walls and doors that point to damaged refractory.
UC32 Cooking time alerts. Warns when an oven is running longer or shorter than its target cooking time.
UC37 Oven temperature readings. Oven temperatures recorded continuously from existing instruments or new pyrometers.
5.10 Chapter 10: Cooling
Water sprays the hot block in the cooling house. Before loading, a heat camera checks for any remaining hot spots, so no glowing coke reaches the trucks or belts.
UC38 Hot coke check before loading. Heat cameras check the cooled coke for hot spots before it is loaded, to protect trucks and belts.
UC39 Cooling time and water use. How long each block is sprayed and how much water is used.
5.11 Chapter 11: Quality check and sizing
The lab tests the batch and records the results against oven B-117, the blend and the coal lots behind it. The coke is broken to 40 mm and a camera on the belt measures the size mix. The batch passes Grade 2, and a test certificate is ready.
UC42 Coke size check by camera. AI measures the share of 20, 40 and 60 mm coke and fines on the belt, all day, instead of occasional sieving.
UC43 Rejects and fines. How much coke is rejected or ends up as fines each day.
UC40 Digital quality lab. Every test result is recorded per batch and linked to its oven, blend and coal lots.
UC41 Test certificate. A test certificate is produced for every dispatch, ready to send to the buyer.
UC44 Finished coke stock by size. Sensors on the product hoppers show stock of each size, live.
UC45 Daily yield. Coke made against coal used, every day, by blend and line.
5.12 Chapter 12: Loading and dispatch
The coke is reserved for this order. At the loading bay, AI confirms the truck is loaded from the 40 mm hopper and covered with a tarpaulin. At the exit, the number plate is read again and the truck counted out, the exit weight flows into the challan and invoice, and the buyer receives the dispatch details and test certificate. The order closes.
UC47 Right grade loading check. AI checks that coke is loaded from the right hopper into the truck booked for that order.
UC48 Truck covered check. AI checks that the loaded truck is covered with a tarpaulin before it leaves.
UC50 Missed weighment alert. If a truck tries to leave without being weighed, or without a dispatch record, the gate is alerted.
UC46 Coke reserved for the order. Finished coke is reserved for each order so the right lot goes to the right buyer.
UC49 Exit weight to invoice. The exit weight goes straight into the delivery challan and invoice.
UC51 Order closed, buyer informed. Dispatch details, weight and test certificate are shared with the buyer, and the order is closed.
5.13 Chapter 13: Round the clock: guarding the plant
At 2:14 at night, a person climbs the north boundary wall near the coal shed. AI detects it within seconds and sends the security supervisor a phone alert with a photo and a short video clip. The same cameras check safety gear on the day shift, watch for fire, and mark attendance by face.
UC52 Intrusion and theft alerts with evidence. AI watches the boundary, coal shed and coke yard, day and night. If a person or vehicle enters where it should not, security gets a phone alert with a photo and a short video clip.
UC53 Pilferage watch. AI flags unusual activity: material carried out, trucks stopping in odd places, or loading outside working hours.
UC54 Safety gear check. AI checks that people near ovens and machines wear helmets, safety shoes and heat-resistant clothing.
UC55 Fire and smoke alerts. AI spots fire or smoke anywhere a camera can see and alerts at once.
UC56 Face-recognition attendance. Workers and contract labour are marked present by face, with a live headcount by area for emergencies.
UC57 Vehicle movement inside the plant. AI flags speeding and vehicles entering restricted areas.
—
5.14 Chapter 14: Keeping machines healthy
Over three weeks, the vibration on crusher 2's bearing slowly rises. AI notices the change long before anyone could hear it and warns maintenance to replace the bearing at the next planned stop. Preventive servicing runs to a schedule, and every job is recorded.
UC59 Predictive maintenance. AI learns how each machine normally behaves and warns days before a likely breakdown, saying which part to check.
UC63 Power section monitoring. If GMCE runs a waste-heat or power section, its boilers and turbine are watched the same way.
UC58 Machine sensors. Small sensors on crushers, conveyors, stampers, finishing machines and pumps read vibration, temperature, current and pressure every few seconds.
UC60 Preventive maintenance schedule. Planned servicing by running hours and calendar, with work orders and spare parts tracked.
UC61 Energy per tonne. Power used by each section and per tonne of coke.
UC62 Emissions reporting. Emissions and environment data collected and prepared for the State Pollution Control Board.
5.15 Chapter 15: The plant head's day
At 8 in the morning the plant head opens one screen: orders, coal by grade, all 328 (approx) ovens, coke made, quality, machine health and alerts. The plant head asks, in Hindi, how much Grade 2 coke went out this week, and gets the answer straight away.
UC66 7-day production forecast. AI forecasts coke output for the next 7 days from ovens charged, cooking times and machine health.
UC67 Ask the plant, in English or Hindi. The plant head can ask questions like “How much Grade 2 coke did we dispatch this week?” and get the answer, plus a short plant summary every morning.
UC64 Plant command centre. One screen for the plant head: orders, coal, ovens, coke, quality, machines and safety, live and by day.
UC65 Alerts on your phone. Important alerts reach the right person on WhatsApp or SMS, with photo or video evidence where available.
The Complete List of Use Cases
There are 67 use cases in all, in the order of the story. 37 of them use AI directly. Each is described in plain words; the next section gives the exact solution behind each one.
| No. | Use case | What it does, in simple words | Type |
|---|---|---|---|
| Chapter 1 · The order arrives | |||
| UC01 | Order book | Every buyer's order is entered once: coke grade, size, quantity and delivery date. Everyone in the plant sees the same order. | Software |
| UC02 | Production planning | The system works out how many ovens to charge each day and how much coal of each grade the orders need. | Software |
| UC03 | On-time delivery forecast | AI checks ovens, coal stock and machine health every day and warns if an order is at risk of being late. | AI prediction |
| Chapter 2 · Planning the blend | |||
| UC04 | Blend recipe planner | Recommends the coal mix for each order, for example 25% Coal B and 75% Coal C, from the order's limits and each coal lot's test results. | Software |
| UC05 | Coke quality forecast before charging | The lab still tests every batch. Before ovens are charged, AI uses the lab results of the coal lots in the blend, and how past blends turned out, to forecast the ash, sulphur and strength the coke will have, so a risky mix is changed before coal is wasted. | AI prediction |
| Chapter 3 · Buying the right coal | |||
| UC06 | Coal stock by grade | Live stock of every coal grade in the shed and hoppers, so purchase knows exactly what is there. | Software + Sensors |
| UC07 | Coal reorder alert | AI forecasts how many days each coal grade will last against the orders in hand and alerts purchase before it runs out. | AI prediction |
| UC08 | Demand forecast and coal stocking plan | AI learns from past orders, buyers and seasons to forecast which coke grades are likely to be ordered in the coming weeks, and recommends how much of each coal grade to stock, so coal is bought before the orders arrive. | AI prediction |
| UC09 | Supplier quality record | Each supplier's coal quality, truck by truck, to guide buying and support quality claims. | Software |
| Chapter 4 · The coal truck reaches the gate | |||
| UC10 | Number plate reading | A camera reads every truck's number plate at entry and exit, day and night, without anyone writing it down. | AI vision |
| UC11 | Truck counting | AI counts every coal truck coming in and every coke truck going out, by hour, shift and day. | AI vision |
| UC12 | Truck matched to order and coal grade | The truck number is matched to the expected supplier, purchase order and coal grade. Unknown trucks are flagged at the gate. | Software |
| UC13 | Truck waiting time | Time from gate-in to gate-out for every truck, with delays shown stage by stage. | AI vision + Software |
| Chapter 5 · On the weighbridge | |||
| UC14 | Automatic weight capture | Weight goes straight from both existing weighbridges into the system. Nobody types or writes it. | Sensors + Software |
| UC15 | Weighment photo evidence | Every weighment stores photos of the truck on the platform and of its number plate. | AI vision + Software |
| UC16 | Weighbridge cheating alerts | AI flags a person or object on the platform, a truck not fully on it, or the same truck weighed twice. | AI vision |
| UC17 | Net weight and weigh slip | Gross, tare and net weight worked out and the weigh slip printed automatically. | Software |
| Chapter 6 · Unloading in the shed | |||
| UC18 | Coal test result per truck | The lab result of each truck's sample is stored against that truck and coal lot. | Software |
| UC19 | Right coal, right hopper | AI watches unloading and confirms which hopper each truck tipped into. If the grade is wrong, it raises an alert at once. | AI vision |
| UC20 | Coal grade tracking, coal to coke | Follows each coal lot from truck to hopper, blend, oven and coke batch, and on to the buyer's truck. | Software |
| UC21 | Hopper levels | Sensors show how full each hopper is, all the time. | Sensors |
| UC22 | Coal fire watch | Heat cameras spot coal heating up in the shed before it catches fire. | AI vision |
| UC23 | Coal reconciliation | Coal received minus coal used is checked against coal in stock every day. Gaps are flagged. | Software |
| Chapter 7 · Blending and crushing | |||
| UC24 | Blend check, actual vs recipe | Belt weigher readings confirm that the actual mix matches the recipe for the order. | Sensors + Software |
| UC25 | Stones and metal on the belt | AI spots stones, metal, wood or oversize lumps on the belt before they reach the crushers. | AI vision |
| UC26 | Belt health | AI spots belt tears, a belt running off-centre, spillage, or a belt running empty. | AI vision |
| UC27 | Crusher output and stoppages | Tonnes crushed per hour, running hours and every stoppage with its reason. | Sensors + Software |
| Chapter 8 · Stamping and charging the ovens | |||
| UC28 | Oven tracker, all 328 (approx) ovens | Shows every oven's state and cooking time on one screen. Shift teams update it on tablets from day one; cameras then update it automatically. | Software + AI vision |
| UC29 | Oven number recognition | Cameras on the stamper read which oven it is charging, so every charge is logged against the right oven. | AI vision |
| UC30 | Charge counting | AI counts every charge by stamper, line and shift. Production is counted, not estimated. | AI vision |
| UC31 | Danger zone on the rail tracks | If a person is near a moving stamper or finishing machine, a siren sounds and the operator is warned. | AI vision |
| Chapter 9 · Cooking and pushing | |||
| UC32 | Cooking time alerts | Warns when an oven is running longer or shorter than its target cooking time. | Software |
| UC33 | Push detection | Cameras on the finishing machines record every push against its oven, and compare it with the plan. | AI vision |
| UC34 | Under-cooked coke warning | Heavy smoke when an oven is pushed is a sign of under-cooking. AI spots it and alerts the shift in-charge. | AI vision |
| UC35 | Oven door leaks | AI spots smoke leaking from oven doors so seals are fixed early. | AI vision |
| UC36 | Oven wall hot spots | Heat cameras map hot spots on oven walls and doors that point to damaged refractory. | AI vision |
| UC37 | Oven temperature readings | Oven temperatures recorded continuously from existing instruments or new pyrometers. | Sensors |
| Chapter 10 · Cooling | |||
| UC38 | Hot coke check before loading | Heat cameras check the cooled coke for hot spots before it is loaded, to protect trucks and belts. | AI vision |
| UC39 | Cooling time and water use | How long each block is sprayed and how much water is used. | Sensors |
| Chapter 11 · Quality check and sizing | |||
| UC40 | Digital quality lab | Every test result is recorded per batch and linked to its oven, blend and coal lots. | Software |
| UC41 | Test certificate | A test certificate is produced for every dispatch, ready to send to the buyer. | Software |
| UC42 | Coke size check by camera | AI measures the share of 20, 40 and 60 mm coke and fines on the belt, all day, instead of occasional sieving. | AI vision |
| UC43 | Rejects and fines | How much coke is rejected or ends up as fines each day. | AI vision + Software |
| UC44 | Finished coke stock by size | Sensors on the product hoppers show stock of each size, live. | Sensors |
| UC45 | Daily yield | Coke made against coal used, every day, by blend and line. | Software |
| Chapter 12 · Loading and dispatch | |||
| UC46 | Coke reserved for the order | Finished coke is reserved for each order so the right lot goes to the right buyer. | Software |
| UC47 | Right grade loading check | AI checks that coke is loaded from the right hopper into the truck booked for that order. | AI vision |
| UC48 | Truck covered check | AI checks that the loaded truck is covered with a tarpaulin before it leaves. | AI vision |
| UC49 | Exit weight to invoice | The exit weight goes straight into the delivery challan and invoice. | Software |
| UC50 | Missed weighment alert | If a truck tries to leave without being weighed, or without a dispatch record, the gate is alerted. | AI vision + Software |
| UC51 | Order closed, buyer informed | Dispatch details, weight and test certificate are shared with the buyer, and the order is closed. | Software |
| Chapter 13 · Round the clock: guarding the plant | |||
| UC52 | Intrusion and theft alerts with evidence | AI watches the boundary, coal shed and coke yard, day and night. If a person or vehicle enters where it should not, security gets a phone alert with a photo and a short video clip. | AI vision |
| UC53 | Pilferage watch | AI flags unusual activity: material carried out, trucks stopping in odd places, or loading outside working hours. | AI vision |
| UC54 | Safety gear check | AI checks that people near ovens and machines wear helmets, safety shoes and heat-resistant clothing. | AI vision |
| UC55 | Fire and smoke alerts | AI spots fire or smoke anywhere a camera can see and alerts at once. | AI vision |
| UC56 | Face-recognition attendance | Workers and contract labour are marked present by face, with a live headcount by area for emergencies. | AI vision |
| UC57 | Vehicle movement inside the plant | AI flags speeding and vehicles entering restricted areas. | AI vision |
| Chapter 14 · Keeping machines healthy | |||
| UC58 | Machine sensors | Small sensors on crushers, conveyors, stampers, finishing machines and pumps read vibration, temperature, current and pressure every few seconds. | Sensors |
| UC59 | Predictive maintenance | AI learns how each machine normally behaves and warns days before a likely breakdown, saying which part to check. | AI prediction |
| UC60 | Preventive maintenance schedule | Planned servicing by running hours and calendar, with work orders and spare parts tracked. | Software |
| UC61 | Energy per tonne | Power used by each section and per tonne of coke. | Sensors |
| UC62 | Emissions reporting | Emissions and environment data collected and prepared for the State Pollution Control Board. | Sensors + Software |
| UC63 | Power section monitoring | If GMCE runs a waste-heat or power section, its boilers and turbine are watched the same way. | Sensors + AI prediction |
| Chapter 15 · The plant head's day | |||
| UC64 | Plant command centre | One screen for the plant head: orders, coal, ovens, coke, quality, machines and safety, live and by day. | Software |
| UC65 | Alerts on your phone | Important alerts reach the right person on WhatsApp or SMS, with photo or video evidence where available. | Software |
| UC66 | 7-day production forecast | AI forecasts coke output for the next 7 days from ovens charged, cooking times and machine health. | AI prediction |
| UC67 | Ask the plant, in English or Hindi | The plant head can ask questions like “How much Grade 2 coke did we dispatch this week?” and get the answer, plus a short plant summary every morning. | AI prediction |
Table 5. All use cases. Type: AI vision = cameras with AI; AI prediction = models that learn from plant data; Sensors = measuring devices; Software = ERP and dashboards.
Our Solution Against Each Use Case
For every use case, this is exactly what ThirdEye provides: the AI or software, the hardware, and the phase in which it goes live.
| No. | Use case | What ThirdEye provides | Hardware | Phase |
|---|---|---|---|---|
| Chapter 1 · The order arrives | ||||
| UC01 | Order book | Software Plant ERP, Orders module, on laptop and mobile | Office laptops, tablets | 1 |
| UC02 | Production planning | Software ERP planning engine that converts orders into an oven and coal plan | None extra | 1 |
| UC03 | On-time delivery forecast | AI prediction Forecasting model trained on GMCE's own production history | On-site servers | 4 |
| Chapter 2 · Planning the blend | ||||
| UC04 | Blend recipe planner | Software Blend calculator in the ERP using lab results for ash, volatile matter and sulphur | None extra | 1 |
| UC05 | Coke quality forecast before charging | AI prediction Ash and sulphur calculated from the coal lots' lab results; a machine-learning model, trained on each past blend and its coke lab results, forecasts strength (CSR) | On-site servers | 4 |
| Chapter 3 · Buying the right coal | ||||
| UC06 | Coal stock by grade | Software + Sensors ERP stock ledger, updated from weighbridge, unloading and hopper level readings | Radar level sensors on hoppers | 1 |
| UC07 | Coal reorder alert | AI prediction Days-of-cover forecasting model | None extra | 4 |
| UC08 | Demand forecast and coal stocking plan | AI prediction Demand forecasting model on the ERP order history, linked to the coal stock planner | None extra | 4 |
| UC09 | Supplier quality record | Software ERP supplier ledger linked to lab results | None extra | 1 |
| Chapter 4 · The coal truck reaches the gate | ||||
| UC10 | Number plate reading | AI vision Automatic number plate recognition (ANPR) AI on the gate cameras | 4 ANPR cameras, in and out lanes | 1 |
| UC11 | Truck counting | AI vision Vehicle detection and counting AI on gate cameras | Gate cameras (shared with UC09) | 1 |
| UC12 | Truck matched to order and coal grade | Software ERP gate module linked to purchase orders | Gate tablet | 1 |
| UC13 | Truck waiting time | AI vision + Software Number-plate time stamps at gate, weighbridges, unloading and exit | Gate and yard cameras | 2 |
| Chapter 5 · On the weighbridge | ||||
| UC14 | Automatic weight capture | Sensors + Software Integration with the weighbridge indicators | 2 weighbridge integration kits | 1 |
| UC15 | Weighment photo evidence | AI vision + Software Camera snapshot linked to each weighment record | 4 weighbridge cameras (top and side) | 1 |
| UC16 | Weighbridge cheating alerts | AI vision Vision AI rules on weighbridge cameras | Weighbridge cameras | 2 |
| UC17 | Net weight and weigh slip | Software ERP weighbridge module | Slip printer | 1 |
| Chapter 6 · Unloading in the shed | ||||
| UC18 | Coal test result per truck | Software ERP lab module | Lab tablet | 1 |
| UC19 | Right coal, right hopper | AI vision Vision AI on unloading-bay cameras matched to the truck's grade | 6 shed cameras | 2 |
| UC20 | Coal grade tracking, coal to coke | Software ERP traceability chain built from gate, unloading, blend and oven records | None extra | 1 |
| UC21 | Hopper levels | Sensors Radar level sensors feeding the ERP | About 18 radar level sensors | 2 |
| UC22 | Coal fire watch | AI vision Thermal AI with temperature alarms | 2 thermal cameras | 2 |
| UC23 | Coal reconciliation | Software ERP daily reconciliation report | None extra | 2 |
| Chapter 7 · Blending and crushing | ||||
| UC24 | Blend check, actual vs recipe | Sensors + Software Belt weigher integration and recipe comparison | Belt weigher link | 2 |
| UC25 | Stones and metal on the belt | AI vision Vision AI on belt cameras | Belt cameras | 3 |
| UC26 | Belt health | AI vision Vision AI on belt cameras | Belt cameras | 2 |
| UC27 | Crusher output and stoppages | Sensors + Software Motor-current and belt weigher readings logged in the ERP | Current monitors | 2 |
| Chapter 8 · Stamping and charging the ovens | ||||
| UC28 | Oven tracker, all 328 (approx) ovens | Software + AI vision ERP oven module; automated by UC28 and UC32 | Shift tablets | 1 |
| UC29 | Oven number recognition | AI vision Vision AI on stamper-mounted cameras | 7 (approx) stamper cameras | 2 |
| UC30 | Charge counting | AI vision Vision AI event counting | Stamper cameras | 2 |
| UC31 | Danger zone on the rail tracks | AI vision Person detection AI with siren and beacon output | Track cameras, 10 sirens and beacons | 2 |
| Chapter 9 · Cooking and pushing | ||||
| UC32 | Cooking time alerts | Software Rules on the oven tracker | None extra | 2 |
| UC33 | Push detection | AI vision Vision AI on finishing-machine cameras | 3 (approx) finishing-machine cameras | 2 |
| UC34 | Under-cooked coke warning | AI vision Smoke detection AI at the push side | Oven-line cameras | 3 |
| UC35 | Oven door leaks | AI vision Smoke detection AI along both batteries | Oven-line cameras | 3 |
| UC36 | Oven wall hot spots | AI vision Thermal AI with oven-by-oven heat maps | 4 thermal cameras | 3 |
| UC37 | Oven temperature readings | Sensors Temperature integration through IoT gateways | Gateways, pyrometers if needed | 3 |
| Chapter 10 · Cooling | ||||
| UC38 | Hot coke check before loading | AI vision Thermal AI with alarm at the loading point | 2 thermal cameras | 2 |
| UC39 | Cooling time and water use | Sensors Flow meters and spray timers logged in the ERP | 2 flow meters | 3 |
| Chapter 11 · Quality check and sizing | ||||
| UC40 | Digital quality lab | Software ERP quality module | Lab tablet | 1 |
| UC41 | Test certificate | Software ERP certificate generator | None extra | 1 |
| UC42 | Coke size check by camera | AI vision Particle size AI on a belt camera | 1 belt camera with lighting | 4 |
| UC43 | Rejects and fines | AI vision + Software Vision AI volume estimate plus ERP records | Screening cameras | 3 |
| UC44 | Finished coke stock by size | Sensors Radar level sensors feeding the ERP | 3 level sensors | 2 |
| UC45 | Daily yield | Software ERP yield report | None extra | 2 |
| Chapter 12 · Loading and dispatch | ||||
| UC46 | Coke reserved for the order | Software ERP allocation | None extra | 1 |
| UC47 | Right grade loading check | AI vision Vision AI at the loading bay matched to the dispatch plan | 3 loading-bay cameras | 2 |
| UC48 | Truck covered check | AI vision Vision AI at the exit | Exit cameras | 2 |
| UC49 | Exit weight to invoice | Software ERP dispatch module linked to the weighbridge and accounting software | None extra | 1 |
| UC50 | Missed weighment alert | AI vision + Software Number-plate check against the day's weighments | Gate cameras | 1 |
| UC51 | Order closed, buyer informed | Software ERP order closure with document sharing | None extra | 1 |
| Chapter 13 · Round the clock: guarding the plant | ||||
| UC52 | Intrusion and theft alerts with evidence | AI vision Intrusion detection AI with evidence clips and alert escalation | 18 perimeter cameras, yard cameras | 1 |
| UC53 | Pilferage watch | AI vision Behaviour rules on yard and road cameras | Yard and road cameras | 2 |
| UC54 | Safety gear check | AI vision PPE detection AI | Plant cameras | 2 |
| UC55 | Fire and smoke alerts | AI vision Fire and smoke detection AI | Plant cameras | 2 |
| UC56 | Face-recognition attendance | AI vision Face-recognition terminals linked to the ERP | 4 attendance terminals | 1 |
| UC57 | Vehicle movement inside the plant | AI vision Vehicle tracking AI on road cameras | Road cameras | 3 |
| Chapter 14 · Keeping machines healthy | ||||
| UC58 | Machine sensors | Sensors Wireless IoT sensors and gateways feeding the machine-health platform | About 65 vibration and temperature sensors, 25 current monitors, 10 pressure transmitters | 2 |
| UC59 | Predictive maintenance | AI prediction Machine-health AI: early-warning alerts first, failure prediction once about 3 months of data has built up | On-site servers | 3 |
| UC60 | Preventive maintenance schedule | Software ERP maintenance module | Maintenance tablet | 1 |
| UC61 | Energy per tonne | Sensors Smart energy meters feeding the dashboard | 12 energy meters | 3 |
| UC62 | Emissions reporting | Sensors + Software Data integration and compliance reports | Integration with monitoring instruments | 3 |
| UC63 | Power section monitoring | Sensors + AI prediction Machine-health AI extended to the power section | To size after survey | 4 |
| Chapter 15 · The plant head's day | ||||
| UC64 | Plant command centre | Software Dashboards on desktop, mobile and video wall | Video wall, workstations | 1 |
| UC65 | Alerts on your phone | Software Alert engine with escalation rules | None extra | 1 |
| UC66 | 7-day production forecast | AI prediction Forecasting model | None extra | 4 |
| UC67 | Ask the plant, in English or Hindi | AI prediction AI assistant that answers from the plant's own data | None extra | 4 |
Table 6. Solution, hardware and phase for every use case. Phase 1: 25 use cases before start-up; Phase 2: 23; Phase 3: 11; Phase 4: 8.
The Future Process: Where Every Solution Plugs In
In the future plant, the order plans every step, and each step gets the AI, sensors and software that close its gaps. Everything lands in one plant data hub that feeds the command centre and the alerts.
The Plant Command Centre and ERP
The plant head asked for something simple. The command centre shows the whole plant on one screen: a few large numbers, colour only where action is needed, and a tap to open the detail behind any number.
9.1 What the plant head sees, live
The next page shows the plant head's main screen. It refreshes by itself every few seconds from the cameras, sensors, weighbridges and tablets, so nobody has to type numbers in or phone around for them.
- Six big numbers at the top. Coke made against plan, coke dispatched, ovens cooking, orders on time, days of coal left and today's alerts.
- Demand against supply. For every open order, by coke grade and size: how much is dispatched, how much is made and in stock, and how much is still to make. AI marks any order at risk of being late.
- Coal coming in. Coal in stock by grade with the days it will last, an AI warning when a grade will run short, trucks in and out read by number plate, and the status of both weighbridges.
- Bharat zone and Gujarat zone. Every one of the 164 (approx) ovens on each line, coloured by state: empty, charging, cooking, ready to push or overdue. Charges and pushes against plan, average cooking time, and the status of each stamper.
- Alerts with evidence. Each alert comes with a photo or video clip as evidence and also goes to the phone of the person responsible.
- Flow, machine health and questions. Today's flow from coal received to coke dispatched, the health of the main machines, and a box where the plant head can ask a question in English or Hindi.
9.2 The ERP behind the screen
Every number on the screen comes from one plant ERP. These are its modules.
| ERP module | What it records | Used by |
|---|---|---|
| Orders and planning | Buyers' orders and specifications, production plan, blend recipes | Sales, plant head, production |
| Gate and weighbridge | Trucks in and out, weights with photos, weigh slips | Gate and weighbridge staff |
| Raw material | Coal received by supplier and grade, lab results, hopper stock, actual blend | Stores, purchase, production |
| Production | Charge and push log per oven, cooking time, cooling, crusher output | Shift in-charge, production head |
| Quality | Test results per batch, traced to oven, blend and coal lot; test certificates | Quality lab |
| Dispatch | Stock by size, allocation to orders, loading, exit weight, challan and invoice | Sales, dispatch, accounts |
| Maintenance | Machines, schedules, work orders, breakdowns, spares | Maintenance team |
| People and compliance | Attendance, contract labour, safety, emissions and energy | HR, safety and environment |
Table 7. ERP modules. Accounts data is passed to GMCE's accounting software so nothing is entered twice.
How It All Fits Together
Cameras, sensors, the 2 weighbridges and tablets in every section feed one platform in an on-site control room. The ERP, the command centre and the alerts all read the same data.
- Runs on site. AI runs on servers in the plant, so gate, weighbridge and security alerts keep working if the internet drops.
- Built for a coke plant. Every device is rated for dust, heat and steam; fibre is used over long runs near heavy motors.
- Secure. Cameras, sensors and office systems sit on separate networks, with role-based logins and a record of every change.
- Ready to grow. New cameras, sensors or use cases plug into the same platform without redesign.
Hardware We Supply
The full scope is about 95 cameras, about 65 machine-health sensors and an on-site control room. GMCE's 2 existing weighbridges are kept and connected. Quantities are indicative until a 2-day placement survey.
11.1 Cameras and vision
| Item | Where | Qty | Phase |
|---|---|---|---|
| ANPR cameras | Gate, in and out lanes | 4 | 1 |
| Weighbridge cameras | On the 2 existing weighbridges | 4 | 1 |
| Fixed IP cameras, IP66/67 | Gate, shed, belts, crushers, oven lines, cooling, screening, hoppers, loading, stores | 51 | 1 (about 30), rest 2 |
| Machine-mounted cameras | 7 (approx) stampers and 3 (approx) finishing machines | 10 | 2 |
| Thermal cameras | Coal shed, oven batteries, cooling house loading | 8 | 2 and 3 |
| Perimeter cameras | Boundary wall and stockyard | 18 | 1 |
| Face-recognition terminals | Gates and plant entry points | 4 | 1 |
| Sirens and beacons | Stamper and finishing-machine tracks | 10 | 2 |
11.2 Sensors and instrumentation
| Item | Where | Qty | Phase |
|---|---|---|---|
| Weighbridge integration kits | The 2 existing weighbridges | 2 | 1 |
| Vibration and temperature sensors | Crushers, conveyor drives, stampers, finishing machines, pumps | 65 | 2 and 3 |
| Motor current monitors | Main motors of the machines above | 25 | 2 and 3 |
| Hydraulic pressure transmitters | Stampers and finishing machines | 10 | 3 |
| Radar level sensors | Coal hoppers, line hoppers, product hoppers | 18 | 2 |
| Water flow meters | Cooling house | 2 | 3 |
| Smart energy meters | Main feeders by section | 12 | 3 |
| IoT gateways | One per zone | 7 | 2 |
11.3 Network, compute and control room
| Item | Where | Qty | Phase |
|---|---|---|---|
| Fibre ring with industrial PoE switches | Plant-wide | About 20 switches | 1 |
| Wi-Fi access points | Gate, stores, lab, oven lines | 10 | 1 |
| Edge AI servers with GPUs | Control room | 3 | 1 and 2 |
| Video recorders and storage, 30 days | Control room | 2 | 1 |
| Application and database servers | Control room, with backup | 2 | 1 |
| Video wall and workstations | Control room | 1 wall, 2 desks | 1 |
| Online UPS | Control room and cabinets | 1 main + cabinets | 1 |
| Rugged tablets | Gate, stores, lab, shift in-charges | 12 | 1 |
Table 8. Indicative hardware. All cameras will be certified under India's current CCTV security requirements.
Implementation Roadmap
Phase 1 puts the essentials in place before start-up. The rest follows over about six months, each phase starting once GMCE signs off the one before. No fixed date is set: start-up is expected in 15 to 30 days, and Phase 1 needs about 12 to 15 days from order to readiness.
| Phase | Timing | Use cases | Gate to move on |
|---|---|---|---|
| 1 · Start-up essentials | Before plant start-up | 25 | Plant start-up |
| 2 · Visibility | First 2 months of operation | 23 | GMCE signs off AI alert accuracy |
| 3 · Machine health | Months 2 to 4 | 11 | 3 months of machine and production data |
| 4 · Prediction | Months 4 to 6 | 8 | Monthly reviews continue |
Table 9. Phases and gates.
One Partner, End to End
GMCE deals with one ThirdEye program manager for everything: hardware, software, installation partners, warranties and support.
| Area | ThirdEye | GMCE |
|---|---|---|
| Design and survey | Device placement, network design, use-case setup | Plant access, a plant coordinator |
| Procurement | All cameras, sensors, network, servers and devices, with warranties held by ThirdEye | Purchase order and approvals |
| Installation | Mounting, cabling, fibre and commissioning | Control room space, power points, permits |
| Software and AI | AI models, machine-health platform, ERP, command centre, mobile app | Master data: buyers, suppliers, coal and coke grades, machines |
| Handover | Training in English and Hindi, on-site support, user guides | Staff time for training, sign-off per phase |
| Run and support | Helpdesk, device care, AI model retraining, updates | First-line reporting through the plant coordinator |
- Resident engineer on site for the first 3 months after start-up.
- Helpdesk: critical issues (weighbridge, gate or ERP down): response within 1 hour, on site within 4 hours.
- Annual maintenance contract from the end of warranty: device checks, cleaning in dusty areas, spares and updates.
- Monthly review with the plant head on alerts, AI accuracy and the next use cases to switch on.
Why ThirdEye Data
- AI first. Computer vision, predictive maintenance and data platforms are our core work, not add-ons to a hardware sale.
- Proven in the field. We have built AI counting and inspection systems for warehouses and factories, and predictive maintenance solutions for industrial equipment.
- One team for everything. Cameras, sensors, network, AI, ERP and dashboards come from one team, so nothing falls between vendors.
- Built for your plant. Our AI models are trained and tuned on GMCE's own cameras and data, and keep improving as the plant runs.
- Simple to use. Plain-language screens, training in Hindi and English, and an AI assistant that answers questions in either language.
Assumptions and Information Needed
15.1 Assumptions
- Equipment counts are as observed on our visit; small differences do not change the design.
- Start-up is expected in 15 to 30 days; Phase 1 is ready for start-up if the order is placed about 12 to 15 days before it.
- GMCE provides power at each cabinet location and an air-conditioned control room.
- Mounting sensors on machines does not affect their warranties; we confirm this machine by machine during the survey.
- AI prediction needs about 3 months of plant data; early-warning alerts work before that.
- Pricing is not part of this document; a commercial proposal follows once scope is agreed.
15.2 Information we need from GMCE
- Make and model of the 2 weighbridges and any weighbridge software
- GMCE's coke grade definitions and key buyers' specifications
- Coal grades and suppliers GMCE plans to buy, and the lab tests run on each lot
- Number of coal hoppers in the shed
- Make and model of the stampers, finishing machines and crushers, and any control panels we can read
- Existing oven temperature instruments, if any
- Whether the plant has a waste-heat or power section
- Accounting software in use and the invoicing process
- Shift pattern, headcount per shift and contract labour agencies
- Site drawing and boundary length
- The confirmed start-up date and the name of GMCE's plant coordinator
Next Steps
Five steps take GMCE from this proposal to Phase 1 ready at start-up.
- Walk GMCE's leadership and plant head through this proposal, agree the Phase 1 scope and confirm the start-up date.
- ThirdEye runs a 2-day placement survey and signs off the camera, sensor, fibre and control room layout.
- ThirdEye sends the commercial proposal; GMCE places the Phase 1 order.
- About 10 days of Phase 1 installation and ERP setup, while GMCE shares master data.
- Phase 1 live and tested before plant start-up; Phase 2 starts with operations.
Words Used in This Proposal
| Word | What it means, simply |
|---|---|
| AI (artificial intelligence) | Software that learns from examples and data to see, count, predict or answer questions. |
| Computer vision | AI that understands what a camera sees: a truck, a number plate, a person, smoke. |
| ANPR | Automatic number plate recognition: a camera and AI that read vehicle number plates. |
| Thermal camera | A camera that sees heat, used to find hot spots and fires. |
| IoT sensor | A small device that measures something, such as vibration or temperature, and sends it over the network. |
| Predictive maintenance | AI that warns before a machine is likely to fail, based on its sensor readings. |
| Preventive maintenance | Planned servicing at fixed intervals or running hours, before problems arise. |
| ERP | One software system that records orders, stock, production, quality, dispatch and maintenance. |
| Command centre | The screens where the plant head and control room see the whole plant. |
| Edge server | A computer in the plant that runs the AI on site, without depending on the internet. |
| Yield | Coke made divided by coal used. |
| CSR, CRI, M40, M10 | Standard tests of coke strength, reactivity and abrasion. |
Sources
1. Coke (fuel), Wikipedia: coking coal criteria, blend volatile matter, Indian coking coal grades by ash: https://en.wikipedia.org/wiki/Coke_(fuel)
2. India's Shift to Stamp Charging, Commodity Insights (March 2025): https://www.commodityinsights.com.au/news-article/indias-shift-to-stamp-charging
3. Low Ash Metallurgical Coke specification, METSIL: https://metsil.in/lam-coke.php
4. Coke Oven waste heat recovery, Thermal Systems: https://thermalindia.com/application/coke-oven-cdq/
Plant facts come from ThirdEye's site visit to GMCE in November 2026.